| Contract SC-800R. As part of a larger project, the installation of 3,800 LF of 72” RCP casing (87.5”OD) to facilitate the construction of a 54” PCCP pressure main beneath 27th Street in the City of Baltimore using a conventional wheeled TBM. Also included approximately 400 LF of 72” steel casing installed through jacking and hand-mining. 54” PCCP force main was sliplined inside all casings.
Location: Baltimore, MD
Date: 2006 & 2007
Owner: City of Baltimore
Contact Information:
City of Baltimore
Mr. Thomas J. Pompa
201 Abel Wolman Municipal Bldg
Baltimore, MD
(410) 396-3671
|