Full WWTP rehabilitation at West Point — new bioreactors and clarifiers, building retrofits, and a trenchless Hudson River outfall installed beneath active CONRAIL tracks.
Flood-hardening the Sayreville Pump Station for MCUA — electrical upgrades and a 1,700-foot perimeter flood wall built to protect critical wastewater infrastructure.
Upgrade to include granular activated carbon (GAC) treatment for removal of per- and poly-fluoroalkyl substances (PFAS) at the 12 million gallon per day (mgd) groundwater facility.
Anaerobic digestion and Combined Heat and Power upgrades for CCMUA — turning sludge into recoverable energy while renewing critical solids-handling infrastructure.