Pump Station No. 4 Gravity Conversion

Converting Pump Station No. 4 to gravity service in Lake Hiawatha — 3,200 LF of sewers, including a 48-inch microtunnel under Routes 80, 46, and 280 to the existing 72-inch interceptor.

Bay Park Conveyance-Design Build

Diverting Bay Park flows to Cedar Creek to cut Western Bays nitrogen loading by up to 90% — 19,000 LF microtunneled and 37,000 LF sliplined conveyance for NYSDEC and Nassau County.

20″ Subaqueous Water Mains to City Island

This project required the replacement of an existing 100-year old water main with dual 20-inch DIP force mains beneath the Eastchester Bay. The new force mains will provide City Island with clean water.

70th Street

Rebuilding water mains and combined sewers in Maspeth, Queens — open-cut box culverts and large-diameter conveyance to cut flooding, improve drainage, and strengthen drinking-water service for NYC DDC.