NJT Railroad Operation Center (ROC)

Rebuilding NJ TRANSIT’s ROC unit substation after Superstorm Sandy — replacing flood-damaged electrical systems and elevating new equipment above future inundation at the Meadowlands Maintenance Complex.

Brooklyn Vital

Utility and roadway buildout in Brooklyn — sewer, water main, and duct banks paired with green infrastructure including rain gardens, bioswales, and porous pavement.

Pacific Avenue Drainage Improvements

A new pile-supported 60″ stormwater forcemain outfall and pump station at Wildwood’s Learning Avenue beach street end — built with pumps, controls, and diesel backup power.

70th Street

Rebuilding water mains and combined sewers in Maspeth, Queens — open-cut box culverts and large-diameter conveyance to cut flooding, improve drainage, and strengthen drinking-water service for NYC DDC.